Skip to content
American Factbook
Menu

Technical Representative- Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors

Technical Representative- Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors recorded $43.0 thousand of federal contract obligations for this product or service in fiscal year 2026, which ranks 1,923 of 2,291 products and services with a figure in FY2026.

American Factbook Research

Identifiers

Product and Service Code
L044
Registered name
TECHNICAL REPRESENTATIVE- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS

The record

Reported figures for Technical Representative- Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors, each linked to its source
Obligated · FY2026The Product and Service Code says what was bought, which is a different question from who sold it. Contracts only: an assistance award has no product code.$43,000USD
Rank among products and services · FY20261,923 of 2,291by obligations
Share of all products and services · FY2026Of $662.7 billion, which is what every product or service the publisher reported obligated in FY2026 — not the federal total, which is larger.0.0%percent

By fiscal year

Technical Representative- Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors: federal contract obligations for this product or service, by fiscal year
Fiscal yearObligated
FY2023$2,124
FY2024$347,473
FY2025$10,800
FY2026$43,000

The publisher holds five fiscal years of this breakdown. A year missing from this table is a year this product or service was not reported in, not a year of no spending.

The nearest ranks

products and services ranked nearest Technical Representative- Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors, FY2026
Rankproduct or serviceObligated
1,920VORTEX TUBES AND OTHER RELATED COOLING TUBES$45,540
1,921QUALITY CONTROL- NONMETALLIC FABRICATED MATERIALS$44,859
1,922LEASE OR RENTAL OF EQUIPMENT- AIRCRAFT COMPONENTS AND ACCESSORIES$43,173
1,924TECHNICAL REPRESENTATIVE- HAND TOOLS$42,900
1,925LEASE OR RENTAL OF EQUIPMENT- WEAPONS$42,500
1,926TECHNICAL REPRESENTATIVE- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT$41,863

What this data cannot show

  • The fiscal year is not over. These are obligations recorded so far, and a figure here is not comparable with a full year.
  • An obligation is a binding commitment to pay, not money paid. Outlays are reported separately and the two are never equal in the same year.
  • The Product and Service Code says what was bought, which is a different question from who sold it. Contracts only: an assistance award has no product code.
  • This page is built from the database rather than from the committed extract, so it covers every product or service the publisher reported and not only the largest hundred the ranking names. Both come from the same ingest on the date above.

Sources

Last updated

Technical Representative- Furnace, Steam Plant, and Drying Equipment; Nuclear Reactors: $43.0 thousand (FY2026)